Realisation: 2021
Market: Coal mining
Product: Monorail system
Producer: SLT
This monorail is used for handling of the gravitational tightening system installed on the belt of the conveyor being used for coal transportation. It has a load capacity of 1000 kg, a length of 6,300 mm and the height of lift 12,000 mm. It features an overhanging end with a length of 2,600 mm. As the lifting device is used the Stahl chain hoist type ST 1005-8 / 2 2/1. The hoist is powered by a Unilift cable festoon system running in the C-profile of the C1A series. It was a complex delivery from the design of lifting equipment, incl. the main profile and its attachment up to assembly, commissioning and bringing into operation.