Monorail for handling with technological components of the paint shop

2024

 

Realisation: 2024

Market: Painting technology

Product: Monorail

Producer: SLT

The monorail is used for occasional handling of the technological equipment of the paint shop in case of maintenance or repair. It has a load capacity of 800 kg, a length of 5,800 mm and a height of lift 10 500 mm. A Stahl type ST 1005-8/2 2/1 chain hoist is used as a lifting device with lifting speed 1 / 4 m/min. The hoist is powered by the Unilift festoon system travelling on the I-profile of the KDF series. It was a complex delivery from the design of the lifting device, main switch, control of the static design of the support profile and its attachment to implementation, assembly, commissioning and handing over to the customer.

Gallery

Contact us for a quote

We will answer your queries within 24 hours.
We will not disclose your data to any third parties.