Monorail designed for paint shop maintenance

2023

 

Realisation: 2023

Market: Painting technology

Product: Monorail

Producer: SLT

Two pieces of monorails delivered to the tram repair plant as a part of the paint shop technology. The monorails are used for handling the components of the paint shop during its maintenance. The lifting mechanism consists of a Stahl chain hoist type ST 2010-12/3 1/1 with a load capacity of 1 000 kg and a lifting height of 11 m. The chain hoists are supplied by the festoon system Unilift running on I-Beam. The delivery also included the main switches and comprehensive documentation that corresponded to the standards and needs of the railway authority.

Gallery

Contact us for a quote

We will answer your queries within 24 hours.
We will not disclose your data to any third parties.