Energy supply of a crab working on a bridge crane in steel mills

2024

 

Realisation: 2024

Market: Metallurgical industry

Product: Festoon system running on I-profile

Producer: Unilift

This festoon system, which replaced the previously used energy chain, is used to power the crab of the bridge crane in the ironworks. The cable trolleys are from the KDF / P50 series, the length of the travel is 28m with a cable loop of 1.5m. Cable trolleys have been running on the profile I120 and carry flat rubber cables.

Gallery

Contact us for a quote

We will answer your queries within 24 hours.
We will not disclose your data to any third parties.