Energy supply of a crab used on a new metallurgical crane

2024

 

Realisation: 2024

Market: Metallurgical Industry

Product: Festoon system running on I-profile

Producer: Conductix

Power supply of a crab used on an overhead crane in ironworks. The crane operates in a demanding environment of metallurgical plant. As the energy supply for the crab is used festoon system running on I-profile ( I140 ). The track length is 15.5 m and the festoon system is equipped with flat and round rubber cables.

Gallery

Contact us for a quote

We will answer your queries within 24 hours.
We will not disclose your data to any third parties.