Realisation: 2024
Market: Handling of steel blanks on the production line
Product: Enclosed conductor bar
Producer: Fels
Two pieces of enclosed conductor bars Fels 100 are used to supply the overhead cranes in 2 production halls of a global concrete element manufacturer. These cranes are used in the production process. Both crane railways are long 108 m and they are equipped with feeding points in the middle. On one crane railway are placed 2 pcs of production overhead cranes - Ferro 6.3t+6.3t and SLT 6.3t . On the second railway is placed bridge crane Ferro 6,3t+6,3t.